■信息反馈 ■产品样本 ■联系我们 ■分公司链接
首页 -- 产品与经营范围 -- 液压元件
 
                 系统工程
  迈克液压工程部可以提供包括液压、润滑、自动化控制系统和液压缸的设计制造、现场管路安装、清洗循环、调试六位一体的系统“钥匙 ”工程。不仅在这六个方面上用户可以得到高质量的液压设备和服务而且通过统一管理协调可大大缩短整个工程完成时间(唐钢整个高线轧机液压润滑系统(含打包机主机)搬迁和安装到整个系统清洁度NAS5级一共25天)。目前在国内我公司是提供这种液压工程服务最全面的企业
  迈克液压系统工程包括:
  1 液压系统设计制造
  2 润滑系统设计制造
  3 液压缸设计制造
  4 自动化系统设计制造
  5 液压现场管路工程安装
  6 液压润滑电控系统现场调试

  System engineering
  MECC Hydraulic can design and manufacture hydraulic, lubrication, automatic systems & cylinders. MECC Hydraulic also can supply piping installation and cleaning circulation, commissioning on site. This can be called Turn-key project. The customer only needs to face one supplier instead of six suppliers for a hydraulic project. Customers can get high quality hydraulic equipments and service. Project’s period can be shortened (about 10-20 days) thanks to simple management chains. MECC Hydraulic is the best enterprise for the ‘turn-keys’ projects in China.
Hydraulic engineering include:
  1 Hydraulic system designing and manufacturing
  2 Lubricating system designing and manufacturing
  3 Hydraulic cylinder designing and manufacturing
  4 Automatic system designing and manufacturing
  5 Piping installation on site
  6 Electric controlled system and commissioning on site.

  大型翻车机液压系统工程(与美国美卓集团合作)(液压系统 现场管路工程和调试)-山东日照港口、塘沽港口。
  Dumper hydraulic system for Metso Group (hydraulic system, piping on site and commissioning) used in Rizhao port and Tanggu port.
  太钢二热轧改造液压系统工程(液压系统、部分液压缸、现场管路工程和调试)
  Hot strip mill hydraulic system for Taiyuan I/S Co.(hydraulic system, cylinder, piping installation and commissioning)
  3500t中板轧机AGC液压压下系统工程(全部工程28天完成,所有管路清洁度达到NAS5级)(液压系统 现场管路工程和调试)-首钢
  AGC hydraulic system of 3500t jobbing sheet-rolling mill for Capital I/S Co. (the project finished in 28 days. Cleanness reached to NAS 5. Hydraulic system, piping installation and commissioning)
  2700 AGC中板轧机液压压下系统工程(全部工程20天完成,所有管路清洁度达到NAS5级)(液压系统 现场管路工程和调试)-营口钢厂
  AGC hydraulic system of 2700t jobbing sheet-rolling mill for Yingkou I/S Co. (the project finished in 20 days. Cleanness reached to NAS 5. Hydraulic system, piping installation and commissioning)
  双流水平连铸机工程工程总包(液压系统、润滑系统、电控系统、主机设备、液压缸、现场土建施工,管路工程)-石横特钢
  Two strand horizontal CCM for Shiheng I/S Co. (hydraulic system, lubrication system, electric controlled system, mainframe equipment, cylinder and piping installation)
  高线液压、润滑系统工程(全部工程所有管路清洁度达到NAS5级)(液压系统 现场管路工程和调试)-石横特钢
  High-speed wire hydraulic lubrication system for Shiheng I/S Co.(cleanness reached to NAS 5. piping installation and commissioning)
  750高炉液压系统工程(液压系统 现场管路工程和调试)-江阴兴澄、石横特钢
  750 blast furnace hydraulic system for Jiangyin I/S Co. and Shiheng I/S Co.(piping installation and commissioning)
  6300KN锻压机系统工程(全部工程所有管路清洁度达到NAS7级)(液压系统 现场管路工程和调试)-贵航安大
  6300KN forge press hydraulic system for Guihang Anda I/S Co. (hydraulic system, piping installation and commissioning)
  垃圾挤压机液压系统工程(液压系统、含液压缸、现场管路工程和调试)-宏华公司
  Garbage extruding machine for Honghua Co. (hydraulic system, cylinder, piping installation and commissioning)
  板坯连铸机液压系统工程(液压系统 现场管路工程和调试)-唐钢
  Slab CCM hydraulic system for Tangshan I/S Co. (hydraulic system, piping installation and commissioning)

  我们拥有成熟的现场管路安装经验和液压系统循环清洗的专业技能;有德国进口的液压系统检测仪和清洁度在线检测仪、超声波探伤仪和总流量每分钟可达3000l/m的高压清洗循环设备 所以我们可以给用户提供达到国际水平的液压系统现场管路安装和循环清洗工作。已为用户成功完成近百套AGC、高线轧机、高炉、锻压机、篦冷机(清洁度可达到NAS5级)等液压系统现场管路安装、清洗循环工程 所有我们完成的工程周期和质量不仅得到了用户的好评还得到所有有关外方公司如:西马克、摩根、美国美卓、达涅利等公司的现场工程师的极高评价:
  唐钢高线液压、润滑系统工程(所有管路清洁度达到NAS5级,其中包括进口打包机主机设备在内的高线液压、润滑系统拆移)全部工程25天完成

  Piping Project:
  MECC Hydraulic has finished more than 100 sets of piping project as AGC, mill, forge press, blast furnace, grate cooler and extrusion press (cleanness reached to NAS5). Circular filtrated equipments (2500L/min), CCS1 contamination detector and SK2010 hydraulic system data recorder can supply high quality piping project for user. The engineer from SMS, MORGAN, METSO, DANIELI have praised our projects.
  Capital Steel AGC of 3500 hot strip mill- finished in 30 days, and the cleanness got to NAS 5 degree;
  Ying Kou I/S Corp.AGC of 2700 hot strip mill- finished in 20 days, and the cleanness: NAS 5 degree;
  Shiheng I/S Corp.: High-speed wire rode mill -cleanness reached to NAS 6 degree;
  An Da Co. 6300KN forging press: the cleanness: NAS 7 degree;
  Tang Shan I/S Corp. high-speed wire rode mill- hydraulic lubrication system and packer dismantled, erecting, piping, cleaned: finished in 25 days, and the cleanness reached to NAS 5




             点击进入查看更多产品......

Copyright meec-hydraulic.com All Rights Reserved     联系我们 | 企业邮箱 | 人才招聘 | 设为首页